BYTE · Equipment · Billing Coming soon

Work delivered but not yet invoiced, by contract and month: the figure the draft would bill now

Hire and haulage contracts can deliver work before the invoice goes out. BYTE lists, for each contract and each month, what has been delivered and not yet billed. The figure matches what the draft button would bill now, so the report and the draft agree.

Last updated: 25 November 2026

Unbilled, JuneContractReadyEstimateHire, Customer A12,4001,850Haulage, Customer B6,2500Hire, Customer CLook3,100900Read this sessionRefresh reads againTotalReady to bill21,750Awaiting approval2,750
Illustration of the unbilled report: one row per contract and month, with the ready-to-bill figure, the estimate for machines awaiting approval, and the totals by customer. The names and figures are examples.

What it covers

  • A report with one row for each hire or haulage contract and each month.
  • The ready-to-bill figure is exact, and it is the figure the draft button would bill now. The report never writes anything, so it cannot disagree with the draft.
  • Billed is what the issued invoices say. An open draft is shown beside the row, with its number and amount, and is not counted as billed.
  • Hire machines not yet approved for the month are shown as an estimate, in their own column, and are never added to the exact figure.
  • Each row also lists what needs a look first: days not logged and changes since approval for hire, and duplicate tickets and late trips for haulage.
  • A range of months, by default this month and the two before, at most twelve. A customer filter and a basis filter (hire, haulage, or both).
  • Totals by customer and by currency. A row opens its contract’s month on the hire or trips page, where the billing card drafts the invoice.
  • Export to CSV or XLSX, or print. The report is in Equipment → Reports, for sales users who can open the equipment pages and for org admins.

How it works

  1. The Unbilled work report is under Reports in Equipment.
  2. Pick the range of months, and the customer or the basis (hire, haulage, or both).
  3. Read each row: the ready-to-bill figure, the estimate for machines awaiting approval, and what needs a look first.
  4. A row leads to its contract’s month, where the billing card drafts the invoice.
  5. Export the table, or print it. Entering the page again in the same session reads nothing until you choose Refresh.

One contract, one month, in figures

The figures are examples of the columns of one row.

ColumnWhat it showsAmount
Ready to billDelivered and not yet billed, exact12,400
Awaiting approvalMachines not yet approved for the month, an estimate1,850
IssuedBilled by invoices that were issued8,000
Open draftA draft not yet issued, shown beside the row2,200

The open draft is shown beside the row and is not counted as billed. The estimate is never added to the exact figure.

At a glance

Built means the feature is in BYTE's current build. BYTE is coming soon, so ask us for the status of anything you need.

AreaWhat BYTE doesStatus
ScopeHire and haulage contracts, one row per contract and monthBuilt
Ready to billThe exact figure, the same as the draft buttonBuilt
Awaiting approvalHire machines not yet approved, as an estimate in their own columnBuilt
BilledWhat the issued invoices say; an open draft shown beside the rowBuilt
Needs a lookDays not logged, changes since approval, duplicate tickets and late tripsBuilt
RangeThis month and the two before by default; at most twelve monthsBuilt
ExportCSV, XLSX and printBuilt

Ask us before you decide

  • How many hire or haulage contracts do you invoice each month?
  • Do you bill by the day, by the trip or by the month, and how long does work usually take to reach an invoice?
  • Who in your team should see the unbilled figure before month end?

Questions about unbilled hire and haulage work

Does the report create invoices?

No. It shows the figure the draft button would bill now. The draft is made from the contract’s billing card.

Does an open draft count as billed?

No. Only invoices that were issued count as billed. An open draft is shown beside the row, with its number and amount.

Why does a machine show an estimate?

A machine not yet approved for the month has no frozen figure. BYTE prices its days at the current terms and shows the result in its own column, never in the exact figure.

Who can open the report?

Sales users who can open the equipment pages, and org admins. It is in Equipment → Reports.

Be first to try BYTE.

Send us a short note about your business and the modules you care about. We will tell you when early access opens.

Talk to us See all of BYTE

All BYTE pages

Every BYTE module, feature and sub-module, in the same order as the BYTE overview. BYTE overview