BYTE · Inventory · Production Coming soon

Bill of materials in BYTE: components in, finished item out

Mark a stock item as an assembly and list the components that one batch of it uses. A production run takes the components out of stock, puts the finished item in, and moves the value across at the running average cost of each component's shelf.

Last updated: 16 November 2026

Bill of materials, one blockComponentQuantityCost (JOD)Cement, 50 kg2 bags30.00Sand, 1 m³0.5 m³9.00Gravel, 1 m³0.4 m³7.20Cost per block46.20One blockJOD 46.20 in componentsComponents in the bill3 of 50up to 50 per bill
Illustration of an example bill of materials: the components of one block, their quantities and their cost. The figures are examples, not a screenshot.

What it covers

  • An assembly flag on a stock item, ticked on its Stock tab, with its bill of materials below it.
  • A bill for one batch, with up to 50 components, each with its quantity.
  • Components chosen from the stock-tracked items in your catalogue.
  • A production register in the inventory menu, with drafts and history.
  • A production run takes the components out of stock and puts the finished item in, in one movement.
  • Each component leaves at the running average cost of its shelf.
  • The finished item enters at the total cost of its components, divided by the quantity made.
  • The value moves from the component shelves to the shelf of the finished item, with no new account.
  • The quantities for a run are worked out from the bill for the quantity you make.
  • Unticking Assembly removes the bill when you save.

How it works

  1. Tick Assembly on the Stock tab of the item, then list the components that one batch uses.
  2. Open Production in the inventory menu, and choose the inventory, the finished item and the quantity to make.
  3. BYTE fills in the components for that quantity from the bill. Every line can still be edited.
  4. Process the production. The components leave stock, the finished item enters, and the value moves between the shelves.

A worked example

One block takes the components below. The figures are examples.

ComponentQuantity per blockCost (JOD)
Cement, 50 kg2 bags30.00
Sand, 1 m³0.5 m³9.00
Gravel, 1 m³0.4 m³7.20
Total cost per block46.20

For a block sold at JOD 60.00, the components are 77% of the price (46.20 divided by 60.00). The production run moves the same JOD 46.20 from the component shelves to the shelf of the block.

At a glance

Built means the feature is in BYTE's current build. BYTE is coming soon, so ask us for the status of anything you need.

AreaWhat BYTE doesStatus
AssemblyTicked on a stock item, with its bill belowBuilt
ComponentsUp to 50 components on each bill, from stock-tracked itemsBuilt
Production registerIn the inventory menu, with drafts and historyBuilt
Production runComponents out and the finished item in, in one movementBuilt
CostingComponents leave at the running average; the finished item enters at their total cost divided by the quantity madeBuilt
VoucherThe value moves between shelves, with no new accountBuilt
Quantity for a runWorked out from the bill for the quantity madeBuilt
Unticking AssemblyRemoves the bill when you saveBuilt

Ask us before you decide

  • Ask which of your products are assemblies, and which are bought in finished.
  • Ask how many components your longest bill needs, out of the 50 a bill can hold.
  • Ask who in your company should process production runs, and who should check the stock values.

Questions about bills of materials in BYTE

What is a bill of materials?

A bill of materials lists the components, and their quantities, that make one batch of a finished item.

How does a production run affect stock?

It takes the components out of stock and puts the finished item in, in one movement. The value moves between the shelves.

How is the cost of the finished item set?

Each component leaves at the running average cost of its shelf. The finished item enters at their total cost, divided by the quantity made.

Can I make a quantity other than one batch?

Yes. Enter the quantity to make, and the components for that quantity are worked out from the bill.

Can an item stop being an assembly?

Yes. Untick Assembly on the item and save, and its bill of materials is removed.

Be first to try BYTE.

Send us a short note about your business and the modules you care about. We will tell you when early access opens.

Talk to us See all of BYTE